Showing posts with label Master Bath. Show all posts
Showing posts with label Master Bath. Show all posts

Tuesday, March 24, 2015

We're Really Not This Messy

When I was little, I used to hate when my mom made us clean the house for guests, "But they're our friends! They'll like us no matter how the house looks!" 

Now that I'm older, I totally get it. It's not about whether or not your friends/family will still love you, it's about pretending you don't actually wallow in your bedsheets for 2 weeks, let your cats climb on the dining room table, and have a constant competition with your garbage can to see exactly how much trash it can hold. It's about showing you know how you're supposed to be living - somewhere in between sanitary conditions and Martha-Stewart-organized, and hopefully a little closer to the latter.



Since we have exactly T-minus 8 hours until Mike's niece arrives tonight, we've been on high alert, hyper aware of how our home appears to the objective eye. I organized the chaos in the office so we could cram all our other boxes in there, basically making the office the "under the rug" area. Don't open that door.

And we got all crazy in the guest bedroom, trimming out the window, finishing most of the baseboards on the floor, and setting up the new bed.


Nail guns are one of my favorites! I also learned they are
responsible for 150,000 emergency room visits a year!

We hustled in the kitchen - Mike got the shelves up, patched, sanded and stained them, and I unpacked our dishes. He even put up the kitchen hood! Here's a shot in progress:


before staining, with the kitchen hood partially up

completed shelves and installed hood - we still need to remove
the protective plastic. The hood is actually stainless steel.
close up of the kitchen shelves

I think by the end of the day today, we'll have a kitchen sink and dishwasher, and I'm crossing my fingers....hopefully a stove! If not, at least we'll have our grill, a waffle maker, and a crock pot to feed Mike's niece with. Mike also pulled a late night countertop sealing session:

step by step, we're getting stuff done...

Our master bath vanity, pendant lights, and mirrors were installed (thanks, Mike!), and although I'm second guessing my mirror choice and we're looking for a large rectangular one now, this will suffice for the time being. I also finished painting the ceiling in the shower area and could finally properly place the shower light. It really made a difference; the shower feels super glamorous when you're in it, and I can't stop staring at my 2" hexagon tiles. 

vanity shot on the left, shower view on the right

The glass in the shower area hasn't been installed yet (or even priced out), but to be honest, the shower is so huge that the water doesn't even hit the back wall, much less the area where the glass would be. This is awesome for two reasons - no rush to get the glass, and when we finally do get the glass - it won't get too many water spots. 

I think the thing we're most excited about with our niece's visit, is not that she's got us motivated to finish up some lingering projects; it's that we have an excuse to go out and do stuff for the next few days! We made a whole list of hikes to go on, waterfalls to see, things to show her...we can't wait to get out and do something other than remodeling. Fun starts now!




Thursday, March 12, 2015

Chicago, LA, and Home Again

We wrapped up our super busy February with a move into our not-quite-completed home:

we hired professional movers this time to save our backs!

It's a little awkward to live in a home with no stove/kitchen sink/dishwasher/master bedroom/washer-dryer. We can't actually unpack things, because some walls still need to be painted, we don't have interior doors or trim, we're still missing light fixtures, closet doors/systems, and the kitchen is still under construction (counters need grinding, walls need tile). But it's such a relief to be in a home we own, with no worries about the landlord finding out about our (four!) cats, and knowing we can change anything we want.

the current state of the living room

Our current "kitchen" - toaster oven, coffee pot, and hot water dispenser.

It's not all under construction...the flooring is in, and our toilet is awesome.

Princess approves of the new floors!

our fancy toilet, with the heated seat and "nightlight."


We moved the kitties into the home, then 4 days later, took off for Chicago for Wedding Reception Round 2. It was actually really nice to see people I hadn't seen in a long while, and catch up with old friends. I was so busy with friends and family, I didn't even take any pictures!


And then we were off to LA, where we ate our way through the first few days. We had been daydreaming about the food - so we cruised around, alternating running into restaurants and eating in the car. 

Cook's tortas! It's on Atlantic and you should really go.

Donut Friend in Highland Park - I got mine with dulce de leche, bananas and whipped cream.

Ceviche at Guisado's in Echo Park.

Mole tacos and Bistek en salsa roja at Guisado's.

the charcuterie platter at Bestia, where we also saw Gordon Ramsay!

We stayed in a super creepy mansion in Echo Park's historical Victorian neighborhood. The homes are all from the late 1800s and are very well restored and maintained. However, that doesn't detract from the scary factor. This is a pic of the home from the outside:


I was pretty nervous every time we came home late, convinced I'd see a ghostly apparition standing at the top of the stairs, or around the corner....or at the side of my bed. But it did have a nice view:
  
The view from the 3rd story balcony

Honestly the location was ideal for our jaunts around town. We could be back in our old 'hood in 10 minutes. In fact, it was so close to downtown, that one morning Mike ran out and brought me back breakfast in bed!


the coddled egg from Eggslut in Grand Central Market - breakfast is served!

Our LA Wedding Reception Round 3 was just as wonderful as the Chicago one - but imagine having everyone you love in one room, with like 45 seconds to talk to each one. It's overwhelming! I wish I could spend a whole day with each one of our friends and family...and even that wouldn't be enough. I think another trip to Chicago and LA is in order for this year.

But while we're home, we're chipping away at the house projects, one by one. Today, we finally got the carpet installed in the master bedroom, and I'm finishing up the paint so we can move in. Completed "after" pic of the master bedroom coming up soon!

Adding a little drama to the master bedroom with the dark accent wall!





Thursday, February 19, 2015

The Never-Ending Story of Our Renovation

So we're officially in week 7 of remodeling, which was sort of our deadline, and we sort of met it. I say "sort of" because while we are technically going to move into our house this coming Saturday, it's not entirely functional. But let's look at the bright side, shall we? At least we have a place to live!

This week and last has been focused mostly on the kitchen. We had to get the cabinets installed and pour the concrete countertops. We chose concrete for a couple reasons - we love the look, and it was waaay cheaper than going with quartz or granite. For comparison, the "absolute black" granite that we would have chosen would have been $2K just for the granite, then add in the cutting, polishing, and installation, and it would be just ridiculous. And there's very little we could do to reduce the cost and DIY. The concrete, on the other hand, was about $500.00 for the molds, countertop kit, and concrete, and then it's just a bunch of labor and a giant learning curve.

Installation of the cabinets

The cabinets with Durarock and countertop molds screwed in.

We used the counter kit from Z Counterform. Their videos make it look easy. Warning: it is not. It is also extremely messy! Monkeys throwing wet concrete around would have been only slightly worse. I just walked out of the room while Mike was dealing with it. I couldn't watch.

You have to put wire inside the concrete to give it something to adhere to.

Mike screeding the concrete....right onto the floor.

Screeding is when you level the concrete by drawing something across it, and it has to go somewhere. In our case, it went right off the counter onto the kitchen floor, which thankfully wasn't installed yet. So it landed on the plywood subfloor...still very upsetting for me! But concrete doesn't stick to flat surfaces, so Mike was able to clean it all up in a matter of minutes, and we are no worse for wear. It was a great exercise in just letting things go and believing it will all work out in the end! Seriously, who needs couple's therapy? Just remodel a house.

breaking off the molds to reveal Mike's handiwork!

at this stage, the counters need to cure for a few weeks.

The concrete goes in super dark, but dries a beautiful light gray color. It's modern, industrial, and fits our aesthetics perfectly.

close up of the edge. We may leave the pits, I think they add character!

Yep, we did an undermount sink on a poured concrete counter.

The counters will be curing for about 30 days (whoops! we sure didn't do that on the right timeline) before we can have them polished and then seal them, but they're hard and not susceptible to dents or dings, so we can move in and not worry too much about it. 

Next things to do - paint and put in the floors. 

painting with the new neutral - gray.

painting walls with vaulted ceilings is a lot of work!

I wanted light floors and Mike wanted dark. Since we wanted to go cheap (no one in the neighborhood has hardwood, so it didn't make sense to go all out), we went with a nice dark laminate that mimics hand hewn wood. Laminates have come a pretty long way since the first days of Pergo! As Mike and Tyler (our new BFF contractor friend) did the floor installation, I couldn't imagine how much dust hardwood floors would be to install, if laminate kicked up this much dust.

installing the floors in the living room.

Mike cut and installed all the underlay on the floors.

Kitchen floors installed. Please excuse our dust.

One major cost cutting factor in our remodel is the electric - my part time job is for an electrician, so we are getting parts at cost, and a big discount on labor. We installed six super nice, adjustable recessed LED lights in our living room. 

four of the six lights installed.

Finally, a glimpse at our almost completed bathroom! The tile is all in, the vanity is half installed, and I've got a first coat of paint on the walls. We may be living without the glass wall or door for a little while, as we're off to Chicago and LA next week, and we're strapped for time. I never thought I'd ever say this, but I can't wait to stop traveling and just stay home for a few months!

two views of the new bathroom


a peek into the shower from the vanity area

We move in this weekend and while we're living there, we'll still be finishing up all sorts of projects - installing the mirrors, pendant lights, and rest of the vanity for the master bath, all the trim, new doors (or possibly painting the old ones), kitchen backsplash, hood, shelving, closet organizational system, full remodel of the guest bathroom, and oh yeah - a secret reading area hidden by a swinging bookcase. And did I mention I bought a bunch of heirloom seeds for our not-yet-created garden and raised beds? It's going to be a busy spring!










Saturday, January 31, 2015

Renovation Round 3

Mike preparing to climb into our attic space.

Skim coating the walls - it never ends.
It may not look like it from the pictures, but we are almost done, I swear. OK, OK, we do still have the floors to install, kitchen cabinets, sink, countertops to pour (we're doing concrete), backsplash, paint...and don't even get me started on the yard...but the bulk of the skim coating is done.

It's been a labor of love and/or hate. To give you a price comparison on skim coating, it would have cost us at least $2500 or so, in labor alone, to skim coat all the walls and ceilings. Eek! We did a huge chunk by ourselves, but our friend Dylan is helping us with the final bits, thankfully.

Using power tools to mix compound to the right consistency!

The picture below shows the wall next to the window frame. The farthest right (closest to the wood) is what the walls looked like with one layer of joint compound on them. A little over to the left is with two coats, and the furthest to the left is with three coats and a light sanding. After that, you wipe down/vacuum the walls, primer, caulk the corners and anywhere the walls meet, and then finally, paint.

A section of wall that shows how much work we've done.

Our beautiful, smooth, flat, white walls, ready for paint colors...

Our other giant project, which we've needed professional help on, is the master bathroom. We spend tons of time hovering and asking questions from the tile guy, plumber, dry wall guys, and the general contractor, to learn as much as we can (so hopefully we can do this ourselves in the future).

The bathroom framed out.

Mike can hang dry wall, move a few electrical switches, and put in insulation, etc, but it's nice to have guidance on the other things, like framing (and things you have to be licensed for). This is also a great way to learn how much things cost, and how much actual labor goes into each step. Spoiler alert: it's a lot. Pay those guys.

The master bath with some of the insulation and drywall/tileboard up.

The tile guy, Adin, graciously let me lay the first tile!

Tiling the bathroom was super exciting, because we could finally see the light at the end of the tunnel. Once some of the tiles were laid, we were able to envision how gorgeous our brand new bathroom would be! Adin, who owns Artisan Tile and Stone, was our super cool tile guy who was nice enough to tell us what he was doing, every step of the way, so we could do it for ourselves in the kitchen.

The shower with most of the tile in.

The shower shelf/cubby for shampoo and what not.

I picked that awesome hexagon tile above, because my current fascination is bees! I have been following @girlnextdoorhoney on Instagram, and I just love her feed. Anyways the shower cubby is my new favorite thing in the house, because it looks like a little beehive. The soap cubby and the shower floor will have the same tiles - 2" white hexagons. 

Here's a remodeling tip: the two most important rooms in which to invest your remodel money, are the bathroom and the kitchen. This hexagon tile was the most expensive thing we've used so far, at about $7/sq ft (which, if you've researched tiles, is still pretty dang cheap). Try to use your "expensive" stuff in a small visible space, so it "pops" and makes the whole room look expensive. With the bathroom floor, walls, and shower all in the gray tile, the shower floor, the cubbies and our little vertical accent strip of white hexagons will really stand out!

Aside from skim coating (which I got lots of compliments on - yay, add it to my resume), I am also very good at putting together IKEA furniture. So, I tackled this project:

IKEA furniture - gives you a sense of accomplishment once you're done!

...which will eventually be our bathroom vanity. I like to use IKEA for a few things here and there - mix it in with your regular stuff and it's an affordable way to upgrade your look.

And now, we interrupt our remodel to go on vacation! We are sooo excited to share this vacation with you, so check back next week for a sneak peek!


Can you guess where we're headed?